roadway construction

The roadway construction consists of two 24-feet (face to face) divided boulevard section with a raised median separation and a storm sewer system. The proposed pavement structure consists of 10-inch reinforced concrete and 8-inch lime stabilized subgrade.

This rfp is located in Texas, United States.

Details available at: RFP - roadway construction

Posted in , , , . Bookmark the permalink. RSS feed for this post.

Search

Swedish Greys - a WordPress theme from Nordic Themepark. Converted by LiteThemes.com.