Phase 2 HVAC

The work consists of removing two 30 ton HVAC chilled water units and one 7.5 ton and one 10 Ton split system units. The removed units will be replaced by two new 30 Ton and two new 7.5 Ton units. The removed units will not be replaced at their present location. All of the new units will be located...

This rfp is located in Georgia, United States.

Details available at: RFP - Phase 2 HVAC

Posted in , , , . Bookmark the permalink. RSS feed for this post.

Search

Swedish Greys - a WordPress theme from Nordic Themepark. Converted by LiteThemes.com.